BLOGGER TEMPLATES - TWITTER BACKGROUNDS »

Thursday, 21 January 2010

Filming

I think that as a whole our opening sequence turned out the way we wanted it to. One of the major problems was the lighting, as we could never get it to the exact same as the previous shot, if we had more time we would improve on the lighting by filming at certain times of the the day so that it is consistent. This was also a major problem because we had to film the outside shots quickly so that the lighting on the inside shots was similar to the previous ones. Therefore it ruins the continuity of the opening sequence but we tried to film at different times on separate days to improve this and overall it seems fine but if it could be improved by having more time that is what we would do, I think that the editing went really well as we shot lots of footage and chose the best shots and edited them until we were happy with the final products.

0 comments: